INDBInternet News Database 2.5 Updated 1 min ago · 288 sources Show or hide images Light or dark

Singapore denies power cut caused causeway jam, blames maintenance, breakdowns

Save Like Comments Compare coverage
Image from South China Morning Post

Summary

Singapore’s Immigration and Checkpoints Authority (ICA) on Thursday rejected a report that a power outage at Woodlands Checkpoint caused traffic congestion along the causeway and on several roads in Johor Bahru on Wednesday. In its account of Wednesday’s events, ICA said a build-up of Singapore-bound traffic occurred amid planned electrical maintenance works, while two vehicle breakdowns on the Malaysian side of the causeway subsequently contributed to traffic tailing back into...

Description from South China Morning Post.

Who is covering this

  1. South China Morning Post Leans right Factuality: High HK
    Singapore denies power cut caused causeway jam, blames maintenance, breakdowns

    Singapore’s Immigration and Checkpoints Authority (ICA) on Thursday rejected a report that a power outage at Woodlands Checkpoint caused traffic congestion along the causeway and on several roads in Johor Bahru on Wednesday. In its account of Wednesday’s events, ICA said a...

Comments

Comments need JavaScript.