$168M loan guarantee provided for First Nations’ investment in LNG pipeline

Summary
Piping is seen on the top of a receiving platform which will be connected to the Coastal GasLink natural gas pipeline terminus at the LNG Canada export terminal under construction, in Kitimat, B.C., on Sept. Covered by 3 outlets: 2 are centre, 1 lean right.
Automated summary picked from the outlets' own descriptions.
Who is covering this
-
$168M Loan Guarantee Provided for First Nations’ Investment in LNG Pipeline
Piping is seen on the top of a receiving platform which will be connected to the Coastal GasLink natural gas pipeline terminus at the LNG Canada export terminal under construction, in Kitimat, B.C., on Sept. 28, 2022. (The Canadian Press/Darryl Dyck)
Low reliability sourceElevated risk - $168M loan guarantee provided for First Nations’ investment in LNG pipeline
- $168M loan guarantee provided for First Nations’ investment in LNG pipeline






Comments
Comments need JavaScript.