Power now the binding constraint on AI datacentres
Summary
<p>Europe’s datacentres will more than double <a href="https://www.computerweekly.com/news/366653432/Data-dive-Datacentre-electricity-how-much-where-why-regions-matter">electricity demand</a> over the next decade, from about 96TWh (terawatt-hours) in 2024 to around 236TWh by 2035. Meanwhile, artificial intelligence (AI) rack power draw is set to climb steeply, from around 20kW (kilowatts) now to as much as 1MW (megawatt) apiece.</p> <p>Bring those two trends together and we find the industry – datacentres and their customers – beginning to measure in metrics such as tokens per watt, time to…
Description from Computerweekly.
Who is covering this
-
Power now the binding constraint on AI datacentres
<p>Europe’s datacentres will more than double <a href="https://www.computerweekly.com/news/366653432/Data-dive-Datacentre-electricity-how-much-where-why-regions-matter">electricity demand</a> over the next decade, from about 96TWh (terawatt-hours) in 2024 to around 236TWh by...
Comments
Comments need JavaScript.